Close Menu
    What's Hot

    Thailand floods kill 71 and hit nearly 909,000 households

    October 13, 2026

    Meta debuts Muse Wonder models for AI agents and coding

    October 13, 2026

    WHO launches 2030 plan for 24-hour health threat detection

    October 13, 2026
    Facebook X (Twitter) Instagram
    GCC UpdateGCC Update
    • Automotive
    • Business
    • Entertainment
    • Health
    • Luxury
    • Lifestyle
    • News
    • More
      • Sports
      • Technology
      • Travel
    GCC UpdateGCC Update
    Home » Northrop Grumman unveils the B-21 nuclear bomber for the US Air Force
    Business

    Northrop Grumman unveils the B-21 nuclear bomber for the US Air Force

    December 3, 2022

    As the first of a new fleet of long-range stealth nuclear bombers for the United States Air Force, Northrop Grumman Corp unveiled its next-generation B-21 Raider jet. In Palmdale, California, the B-21 was unveiled during a dramatic ceremony at Northrop’s Plant 42, allowing the public to see the new aircraft for the first time. Using long-range and mid-air refueling capabilities, the B-21 has a similar flying wing shape as its predecessor, the B-2, and can carry conventional as well as nuclear weapons.

    A 2010 estimate estimated the aircraft would cost approximately $550 million each, or $750 million today in inflation-adjusted dollars. In order to replace the B-1 and B-2 bombers, the Air Force plans to purchase at least 100 of the planes. When Northrop won the 2015 contract to build the bomber, it beat out Boeing Co and Lockheed Martin Corp. More than 400 suppliers from 40 states are involved, including Pratt & Whitney, Collins Aerospace, GKN Aerospace, BAE Systems, and Spirit Aerosystems.

    In light of its ability to connect with other aircraft and easily integrate future weapons into its systems architecture, Northrop is referring to this plane as a sixth generation aircraft. The B-21 also features more durable, stealth-enabling low observable surface material that will require less maintenance and keep operations costs and downtime to a minimum, said Doug Young, sector vice president and general manager at Northrop Grumman Aeronautics Systems.

    This presentation provided the first video and photo images of the all-new bomber. Until now, only artist renderings have been published. A total of six of the planes, which will have their first flight in mid-2023, are currently being assembled. The program is currently being worked on by more than 8,000 people from Northrop Grumman, industry partners, and the Air Force.

    Related Posts

    Oman electricity output grows as water production declines

    October 12, 2026

    African Union launches Africa Credit Rating Agency

    October 9, 2026

    Debt-ridden Pakistan SOE debt climbs to $36.5 billion

    October 7, 2026

    UAE overseas FDI stock rises above $402 billion

    October 6, 2026
    Latest News

    Thailand floods kill 71 and hit nearly 909,000 households

    October 13, 2026

    Meta debuts Muse Wonder models for AI agents and coding

    October 13, 2026

    WHO launches 2030 plan for 24-hour health threat detection

    October 13, 2026

    Pakistan imposes governor’s rule in Khyber Pakhtunkhwa

    October 12, 2026

    Oman electricity output grows as water production declines

    October 12, 2026

    EU announces investment in health of almost €170M plan

    October 10, 2026

    Pakistan bears largest share of rising MENAAP poverty

    October 9, 2026

    African Union launches Africa Credit Rating Agency

    October 9, 2026

    Air Arabia adds new Sharjah to Amman City Airport route

    October 9, 2026

    Jaguar Type 01 electric GT debuts with 1,030 PS

    October 7, 2026
    © 2021 GCC Update | All Rights Reserved
    • Home
    • Contact Us

    Type above and press Enter to search. Press Esc to cancel.